Friday, September 28, 2012

Shed House and Lucky House


We were at my mom's house again. Tom put the two redwood and futon woods in top of the shed house and nailed it down to the post.  We put the roof screen cover on the top. After that we stapled the clear poly sheeting on of top and around the shed house. Next we put the black plastic inside the shed house's ground.

After that we put the carpet on top of the plastic, and glued them together. Tom removed the door next to the shed house and pulled out the nails and put new screws
on the door. He sew the top of the door evenly and put a latch in the door.  Also he fixed the big door (the fence) because it could not close.  Tom needed to remove some of the material from the door  hinge and
then I stacked the milk cage and I
put a longer screw into the wall.
 It was getting dark, so we had
to come back  the next day to finish
 the job. We loaded the trash into
our truck before we went back
inside and had a dinner. 

Sunday, September 9, 2012

Mom's Little Shed House Repair


 9/8-9/9 We were at my mom's house again to fix the shed house.  Before we went to her house, we went to Home Dept and bought 2 2x4x8FT Common Redwood for 2@$7.05/ea. and Screw Red 2IN. 1LB for $9.37.  Next we went to the Big Ben to buy BBQ Pork and Chinese BBQ Duck both for $19.85.  By the time we got to my mom's house it was already past 3:00 p.m.  We started working on the shed house.  We replaced the common redwood hand rail of the fence. Tom saw the fence door was too loose and took it down to fix it. Next Tom looked at the Lucky House and he saw several areas were damaged by the rain. The door had water damage. We needed to take down the door too. Both window frames were in bad condition. We needed to go to the Home Dept again and buy more woods 3/8x8x12, we only needed 8 feet.  Also we needed plastic to wrap around the shed house.